Floating Jetties and Floating Docks

    The floating jetties by PEREBO can be used on many different waters and we guarantee you a flexible and smooth installation process. We offer the floating docks in different modules that can be combined with each other. Be it for a fishermens, swimmers or boaters who want to moor their boat: With our products you have found an affordable and highly effective solution.

    • read more

      Floating Docks and Dock Finger Modules as required

      Each project to building of a floating pier has its own requirements regarding its individual components and accessories. That is why, we provide you with our 4 modular systems the greatest possible flexibility for your project. Significant for the right choice is the determination of the desired load bearing capacity of the floating jetty. Depending on the requirements, the floats PT03, PT04 or PT05 are used. With these floating units, payloads up to 600 kg/m² can be generated. Furthermore, you can define the dimensions of the floating dock itself and select which flooring to use. Here we offer, inter alia, various wood or plastic floor boards. But also metal boards can be used.

      The special feature of our module systems is: You can carry out a lot of works on your floating dock yourself and thereby minimize the costs of purchase. For instance, it’s possible to install the deck covering in DIY-work.

      Of course, it’s not done with a standard floating pier in many projects. Therefore, you have the option to order special constructions. Our experts gladly assist you in planning and implementing of your project.

      As accessories, we offer not only railings and bathing ladders for leisure activities, but also pile guides, chains and concrete anchor-blocks. So, a small floating dock can turn into a comfortable floating landing stage.

      The Floating Dock Facility grows with its tasks

      If you ever need a larger floating jetty, you can easily order new floating dock modules. These will be linked to the existing construction and therefore it can be used without a long waiting time. By the way, this works the other way around also. If you no longer require some of the modules, these can easily be removed.

      Of course, PEREBO also takes care of delivery and installation. If necessary, we bring the floating stages directly to you and fix them up. Just give us a call.

    Profit from our 4 module systems

    icon-schwimmplattform-1

    Perebo-SMALL
    payload= up to 100kg/m²

    icon-schwimmplattform-2

    Perebo-MEDIUM
    payload= up to 200kg/m²

    icon-schwimmplattform-3

    Perebo-LARGE
    payload= up to 320kg/m²

    icon-schwimmplattform-3

    Perebo-EXTRA-LARGE
    payload= up to 600kg/m²

    icon-schwimmplattform-1

    Perebo-Small

    payload= up to 100kg/m²
    Ideal for private use. This means for building of lightly loaded floating jetties.
    (e.g. little floating boat docks, little floating fishing docks, etc.)
    load-bearing elements: Perebo floats PT05

    Assembly Animation

    Assembly Animation floating jetty Perebo-Small

    System Structure described in individual images

    Individual floats PT05
    the floats PT05 are laid with distance

    Floats + Supporting frame
    floats PT05 with attached supporting frame (e.g. wooden- or synthetic material beams)

    Installation of the deck covering
    installation of the deck covering (e.g. wooden or synthetic material flooring)

    Floating dock + Accessories
    attaching of anchoarge components and other fittings

    • Technical Data and Explanations

      When building a floating jetty by means of the module system Perebo-SMALL, the individual floats T05 are laid at distance. On this type of assembly, the plastic floats are interconnected by means of a girder grid made of wood, synthetic material or metal. This girder grid can be screwed into the floats. (screw size: M10) On it can be attached the deck covering. The finished floating dock can be fixed by means of ropes or foundation piles.

      You can either buy from us the individual floats PT05 or pre-assembled modules.

      Technical Data:

      • load-bearing elements: pontoons PT05
      • payload: max. 100kg/m²
      • different deck coverings selectable (wooden- or synthetic material planks or aluminum plates)
      • railing partially or circumferentially mountable
      • during assembly a lifting device is not required

    configure now
    Gladly we advise you also by telephone under +49 (0)3841 224049-0

    icon-schwimmplattform-2

    Perebo-Medium

    payload= up to 200kg/m²
    Suitable for private and public use. This means for building of higher loaded floating jetties.
    (e.g. larger floating boat docks, larger floating fishing docks, etc.)
    load-bearing elements: Perebo floats PT05

    Assembly Animation

    Assembly Animation floating jetty Perebo-Medium

    System Structure described in individual images

    Floats PT05 +
    Connection elements
    the floats PT05 are laid side by side and coupled by steel-connection-elements (single-layer)

    Coupling of the
    floats PT05
    coupling of the individual floats PT05

    Floats + Substructure
    of the deck coveringattaching of the deck covering substructure (e.g. wooden- or synthetic material beams)

    Installation of the
    deck covering
    installation of the deck covering (e.g. wooden or synthetic material flooring)

    Floating dock +
    Accessories
    attaching of anchoarge components and other fittings

    • Technical Data and Explanations

      When building a floating dock by means of the module system Perebo-MEDIUM, the polyethylene floats PT05 are laid side by side until the desired area is reached. (one pontoon layer) All floats are connected by means of steel-clamps. In the next step, beams made of wood, plastic or metal can be screwed into the floats in the longitudinal or cross direction. (the construction of a girder grid is not necessary) On these beams the deck covering can be mounted. The finished floating jetty can be fixed by ropes or piles.

      You can either buy from us the individual floats PT05 + connection elementgs or pre-assembled modules.

      Technical Data:

      • load-bearing elements: pontoons PT05
      • payload: max. 100kg/m²
      • different deck coverings selectable (wooden- or synthetic material planks or aluminum plates)
      • railing partially or circumferentially mountable
      • during assembly a lifting device is not required

    configure now
    Gladly we advise you also by telephone under +49 (0)3841 224049-0

    icon-schwimmplattform-3

    Perebo-Large

    payload= up to 320kg/m²
    Ideal for public use. This means for building of high loaded floating jetties.
    (e.g. floating marina jetties, large floating jetties (open to the public), etc.)
    load-bearing elements: Perebo floats PT03 or PT04

    Assembly Animation

    Assembly Animation floating jetty Perebo-Large

    System Structure described in individual images

    Floats +
    Supporting frame
    all components of the module system Perebo-Large

    Connection of the individual modules
    connection of the individual modules by means of screwing

    Platform + Substructure of the deck covering
    attaching of the deck covering substructure (e.g. wooden- or synthetic material beams)

    Installation of the deck covering
    installation of the deck covering (e.g. wooden or synthetic material flooring)

    Floating dock + Accessories
    attaching of anchoarge components and other fittings

    • Technical Data and Explanations

      The basis of the module system Perebo-LARGE are individual modules, which are screwed together in the shallow water or on land. The individual modules consist of our plastic floats PT03 or PT04 and a steel-supporting-frame. They can be pre-assembled by Perebo. After connection of these modules, wooden- plastic- or metal beams can be screwed into the supporting-frame made of steel. On these beams the deck covering can be mounted. The finished floating jetty can be fixed by means of ground weights, ropes or piles..

      You can either buy from us the individual floats PT03 / PT04 or pre-assembled modules.

      Technical Data:

      • load-bearing elements: PT03 or PT04
      • payload at the use of PT03= max. 200kg/m²
      • payload at the use of PT04= max. 320kg/m²
      • different deck coverings selectable (wooden- or synthetic material planks or aluminum plates)
      • railing-mounting possible
      • during assembly a lifting device is required

    configure now
    Gladly we advise you also by telephone under +49 (0)3841 224049-0

    icon-schwimmplattform-3

    Perebo-Extra-Large

    payload= up to 600kg/m²
    Ideal for public use. This means for building of high loaded floating jetties.
    (e.g. floating marina jetties, large floating jetties (open to the public), etc.)
    load-bearing elements: Perebo floats PT05

    Assembly Animationperebo-floating-jetties-xl-animation

    System Structure described in individual images

    Floats PT05 +
    Connection elementsthe floats PT05 are laid side by side and coupled by steel-connection-elements (double-layer)

    Connection of the individual modulesfloating-jetties-perebo-extra-large-montage_pt05-2

    Platform + Substructure of the deck coveringattaching of the deck covering substructure (e.g. wooden- or synthetic material beams)

    Installation of the deck coveringinstallation of the deck covering (e.g. wooden or synthetic material flooring)

    Floating dock + Accessoriesattaching of anchoarge components and other fittings

    • Technical Data and Explanations

      When building a floating dock by means of the module system Perebo-EXTRA LARGE, the polyethylene floats PT05 are laid side by side until the desired area is reached. (two pontoon layers) All floats are connected by means of steel-clamps. In the next step, beams made of wood, plastic or metal can be screwed into the floats in the longitudinal or cross direction. (the construction of a girder grid is not necessary) On these beams the deck covering can be mounted. The finished floating jetty can be fixed by ropes or piles.

      You can either buy from us the individual floats PT05 + connection elementgs or pre-assembled modules.

      Technical Data:

      • load-bearing elements: pontoons PT05
      • payload: max. 600kg/m²
      • different deck coverings selectable (wooden- or synthetic material planks or aluminum plates)
      • railing partially or circumferentially mountable
      • during assembly a lifting device is not required

    configure now
    Gladly we advise you also by telephone under +49 (0)3841 224049-0

    Accessories for Perebo Floating Docks can be found here

    Selected projects

    Small Floating Boat Docks

    Floating Jetties

    We like to advice you: +49 (0)3841 224049-0

    For a price inquiry please contact us or use our Call-Back Service