Floating Jetties and Floating Docks

    The floating jetties by PEREBO can be used on many different waters and we guarantee you a flexible and smooth installation process. We offer the floating docks in different load capacities that can be combined with each other, if required. Be it for private persons, Marina operators, fishermens or boaters who want to moor their boat: With our products you have found an affordable and highly effective solution.

    • read more

      Floating Docks and Dock Finger Modules in Modular Design

      Each project to building of a floating pier has its own requirements regarding its individual components and accessories. That is why, we provide you with our 4 modular pontoon systems the greatest possible flexibility for your project. Significant for the right choice is the determination of the desired load bearing capacity of the floating jetty. Depending on the requirements, pontoon floaters in different sizes are used. With these floating units, payloads up to 600 kg/m² can be generated. Furthermore, you can define the dimensions of the floating dock itself and select which flooring to use. Here we offer, inter alia, various wood or plastic floor boards. But also metal boards can be used.

      Floating Jetty for DIY

      The special feature of our module systems is: You can carry out a lot of works on your floating dock yourself and thereby minimize the costs of purchase. For instance, it's possible to install the deck cladding in DIY-work. It is often only necessary to order the pure individual plastic floats from us and do all other construction and assembly work yourself, because it is so easy.
      Of course, it’s not done with a standard floating pier in many projects. Therefore, you have the option to order special floating dock constructions too. Our experts gladly assist you in planning and implementing of your project.

      Accessories

      As accessories for your floating jetty, we offer not only railings and bathing ladders, but also pile guides, chains and concrete anchor-blocks. So, a small floating dock can turn into a comfortable floating landing stage.

      Last but not Least

      If you ever want to expand your floating jetty, you can easily reorder new floating dock modules. These will be linked then to the existing construction. By the way, this works the other way around also. If you no longer require some of the modules, these can easily be removed.

      Of course, PEREBO also takes care of delivery and installation (if possible). Just send us an e-mail or give us a call.

    Benefit from our 4 module systems

    icon-schwimmplattform-1

    payload= up to 100kg/m²

    icon-schwimmplattform-2

    payload= up to 200kg/m²

    icon-schwimmplattform-3

    payload= up to 300kg/m²

    icon-schwimmplattform-3

    payload= up to 600kg/m²

    icon-schwimmplattform-1

    Perebo-Small

    payload= up to 100kg/m²
    Ideal for private use or for the construction of lightly loaded floating jetties.
    (e.g. small floating boat docks, floating piers, etc.)
    supporting pontoons: Pontoon floats PT05

    Assembly Animation

    Assembly Animation floating jetty Perebo-Small

    System Structure described in individual images

    Individual floats PT05
    the floats PT05 are laid with distance

    Floats + Supporting frame
    floats PT05 with attached supporting frame (e.g. wooden- or synthetic material beams)

    Installation of the deck covering
    installation of the deck covering (e.g. wooden or synthetic material flooring)

    Floating dock + Accessories
    attaching of anchoarge components and other fittings

    • Technical Data and Explanations

      When building a floating jetty by means of the module system Perebo-SMALL, the individual floats T05 are laid at distance. On this type of assembly, the plastic floats are interconnected by means of a girder grid made of wood, synthetic material or metal. This girder grid can be screwed into the floats. (screw size: M10) On it can be attached the deck covering. The finished floating dock can be fixed by means of ropes or foundation piles.

      You can either buy from us the individual floats PT05 or pre-assembled modules.

      Technical Data:

      • load-bearing elements: pontoons PT05
      • payload: max. 100kg/m²
      • different deck coverings selectable (wooden- or synthetic material planks or aluminum plates)
      • railing partially or circumferentially mountable
      • during assembly a lifting device is not required

       

      Practical example: Assembly floating  jetty "Perebo-SMALL"

    configure now

    Gladly we advise you also by telephone under +49 (0)3841 224049-0

    icon-schwimmplattform-2

    Perebo-Medium

    payload= up to 200kg/m²
    Suitable for private and public use or for the construction of medium-duty loaded floating jetties.
    (e.g. larger floating boat docks, larger floating fishing piers, etc.)
    load-bearing elements: Pontoon floats PT05

    Assembly Animation

    Assembly Animation floating jetty Perebo-Medium

    System Structure described in individual images

    Floats PT05 +
    Connection elements
    the floats PT05 are laid side by side and coupled by steel-connection-elements (single-layer)

    Coupling of the
    floats PT05
    coupling of the individual floats PT05

    Floats + Substructure
    of the deck coveringattaching of the deck covering substructure (e.g. wooden- or synthetic material beams)

    Installation of the
    deck covering
    installation of the deck covering (e.g. wooden or synthetic material flooring)

    Floating dock +
    Accessories
    attaching of anchoarge components and other fittings

    • Technical Data and Explanations

      When building a floating dock by means of the module system Perebo-MEDIUM, the polyethylene floats PT05 are laid side by side until the desired area is reached. (one pontoon layer) All floats are connected by means of steel-clamps. In the next step, beams made of wood, plastic or metal can be screwed into the floats in the longitudinal or cross direction. (the construction of a girder grid is not necessary) On these beams the deck covering can be mounted. The finished floating jetty can be fixed by ropes or piles.

      You can either buy from us the individual floats PT05 + connection elementgs or pre-assembled modules.

      Technical Data:

      • load-bearing elements: pontoons PT05
      • payload: max. 100kg/m²
      • different deck coverings selectable (wooden- or synthetic material planks or aluminum plates)
      • railing partially or circumferentially mountable
      • during assembly a lifting device is not required

    configure now

    Gladly we advise you also by telephone under +49 (0)3841 224049-0

    icon-schwimmplattform-3

    Perebo-Large

    payload= up to 300kg/m²
    Ideal for public use or for the construction of highly loaded floating jetties.
    (e.g. floating marina docks, publicly accessible docks, etc.)
    load-bearing elements: Pontoon floats PT03 or PT04

    Assembly Animation

    Assembly Animation floating jetty Perebo-Large

    System Structure described in individual images

    Floats +
    Supporting frame
    all components of the module system Perebo-Large

    Connection of the individual modules
    connection of the individual modules by means of screwing

    Platform + Substructure of the deck covering
    attaching of the deck covering substructure (e.g. wooden- or synthetic material beams)

    Installation of the deck covering
    installation of the deck covering (e.g. wooden or synthetic material flooring)

    Floating dock + Accessories
    attaching of anchoarge components and other fittings

    • Technical Data and Explanations

      The basis of the module system Perebo-LARGE are individual modules, which are screwed together in the shallow water or on land. The individual modules consist of our plastic floats PT03 or PT04 and a steel-supporting-frame. They can be pre-assembled by Perebo. After connection of these modules, wooden- plastic- or metal beams can be screwed into the supporting-frame made of steel. On these beams the deck covering can be mounted. The finished floating jetty can be fixed by means of ground weights, ropes or piles..

      You can either buy from us the individual floats PT03 / PT04 or pre-assembled modules.

      Technical Data:

      • load-bearing elements: PT03 or PT04
      • payload at the use of PT03= max. 200kg/m²
      • payload at the use of PT04= max. 300kg/m²
      • different deck coverings selectable (wooden- or synthetic material planks or aluminum plates)
      • railing-mounting possible
      • during assembly a lifting device is required

    configure now

    Gladly we advise you also by telephone under +49 (0)3841 224049-0

    icon-schwimmplattform-3

    Perebo-Extra-Large

    payload= up to 600kg/m²
    Ideal for public use or for the construction of very highly loaded floating jetties.
    (e.g. floating bridges, publicly accessible docks, etc.)
    load-bearing elements: Pontoon floats PT05

    Assembly Animationperebo-floating-jetties-xl-animation

    System Structure described in individual images

    Floats PT05 +
    Connection elementsthe floats PT05 are laid side by side and coupled by steel-connection-elements (double-layer)

    Connection of the individual modulesfloating-jetties-perebo-extra-large-montage_pt05-2

    Platform + Substructure of the deck coveringattaching of the deck covering substructure (e.g. wooden- or synthetic material beams)

    Installation of the deck coveringinstallation of the deck covering (e.g. wooden or synthetic material flooring)

    Floating dock + Accessoriesattaching of anchoarge components and other fittings

    • Technical Data and Explanations

      When building a floating dock by means of the module system Perebo-EXTRA LARGE, the polyethylene floats PT05 are laid side by side until the desired area is reached. (two pontoon layers) All floats are connected by means of steel-clamps. In the next step, beams made of wood, plastic or metal can be screwed into the floats in the longitudinal or cross direction. (the construction of a girder grid is not necessary) On these beams the deck covering can be mounted. The finished floating jetty can be fixed by ropes or piles.

      You can either buy from us the individual floats PT05 + connection elementgs or pre-assembled modules.

      Technical Data:

      • load-bearing elements: pontoons PT05
      • payload: max. 600kg/m²
      • different deck coverings selectable (wooden- or synthetic material planks or aluminum plates)
      • railing partially or circumferentially mountable
      • during assembly a lifting device is not required

    configure now

    Gladly we advise you also by telephone under +49 (0)3841 224049-0

    Accessories for Perebo Floating Docks can be found here
    accessories overview

    Selected projects

    Small Floating Boat Docks

    Floating Jetties

     

    We like to advice you: +49 (0)3841 224049-0

    For a price inquiry please contact us or use our Call-Back Service